The main goal of the Divertor Tokamak Test facility (DTT) is to explore alternative power exhaust solutions for DEMO. The principal objective is to mitigate the risk of a difficult extrapolation to fusion reactor of the conventional divertor based on detached conditions under test on ITER. The task includes several issues, as: (i) demonstrating a heat exhaust system capable of withstanding the large load of DEMO in case of inadequate radiated power fraction; (ii) closing the gaps in the exhaust area that cannot be addressed by present devices; (iii) demonstrating how the possible implemented solutions (e.g., advanced divertor configurations or liquid metals) can be integrated in a DEMO device. In view of these goals, the basic physical DTT parameters have been selected according to the following guidelines: (i) edge conditions as close as possible to DEMO in terms of dimensionless parameters; (ii) flexibility to test a wide set of divertor concepts and techniques; (iii) compatibility with bulk plasma performance; (iv) an upper bound of 500 M€ for the investment costs.
The Divertor Tokamak Test facility proposal: Physical requirements and reference design
Ambrosino R.;Barbato L.;Mastrostefano S.;Palmaccio R.;Rubinacci G.;Tarallo A.;Ventre S.;Villone F.;
2017-01-01
Abstract
The main goal of the Divertor Tokamak Test facility (DTT) is to explore alternative power exhaust solutions for DEMO. The principal objective is to mitigate the risk of a difficult extrapolation to fusion reactor of the conventional divertor based on detached conditions under test on ITER. The task includes several issues, as: (i) demonstrating a heat exhaust system capable of withstanding the large load of DEMO in case of inadequate radiated power fraction; (ii) closing the gaps in the exhaust area that cannot be addressed by present devices; (iii) demonstrating how the possible implemented solutions (e.g., advanced divertor configurations or liquid metals) can be integrated in a DEMO device. In view of these goals, the basic physical DTT parameters have been selected according to the following guidelines: (i) edge conditions as close as possible to DEMO in terms of dimensionless parameters; (ii) flexibility to test a wide set of divertor concepts and techniques; (iii) compatibility with bulk plasma performance; (iv) an upper bound of 500 M€ for the investment costs.File | Dimensione | Formato | |
---|---|---|---|
The_Divertor_Tokamak_Test_facility_proposal_Physic.pdf
solo utenti autorizzati
Licenza:
Copyright dell'editore
Dimensione
1.75 MB
Formato
Adobe PDF
|
1.75 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.