This paper proposes a planning technique aimed at optimally sizing and locating distributed storage devices in an unbalanced low voltage microgrid. The planning procedure is formulated in terms of a mixed, non linear, constrained optimization problem: the objective function to be minimized is the cost sustained for the energy provision and for the inclusion of the storage resources while the equality/inequality constraints guarantee the correct operation of the components and of the grid. The problem of unbalances is also dealt with by imposing a maximum unbalance factor value to all of the grid busbars’ voltage. The results of numerical applications are shown to validate the proposal.

Planning of energy storage systems in unbalanced microgrids

Varilone, P.
2017-01-01

Abstract

This paper proposes a planning technique aimed at optimally sizing and locating distributed storage devices in an unbalanced low voltage microgrid. The planning procedure is formulated in terms of a mixed, non linear, constrained optimization problem: the objective function to be minimized is the cost sustained for the energy provision and for the inclusion of the storage resources while the equality/inequality constraints guarantee the correct operation of the components and of the grid. The problem of unbalances is also dealt with by imposing a maximum unbalance factor value to all of the grid busbars’ voltage. The results of numerical applications are shown to validate the proposal.
2017
978-1-5386-1953-7
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11580/69551
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 5
social impact