The work proposed shows the result of a study carried out at the Lepetit plant of Anagni (FR) (chemical-pharmaceutical area) aiming at optimising the times of crossing and the cycle time of production through a reengineering of timing, of work organisation, of production management. The technique adopted were found on the principles of concurrent engineering through a techniques called PCAM (Plant Competitive Assistement Methodology).

Analysis and optimization of the cycle time of production in a processing firm

SILVESTRI, Alessandro;FALCONE, Domenico;DE FELICE, Fabio
2001-01-01

Abstract

The work proposed shows the result of a study carried out at the Lepetit plant of Anagni (FR) (chemical-pharmaceutical area) aiming at optimising the times of crossing and the cycle time of production through a reengineering of timing, of work organisation, of production management. The technique adopted were found on the principles of concurrent engineering through a techniques called PCAM (Plant Competitive Assistement Methodology).
2001
1565552164
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11580/6412
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
social impact