The work proposed shows the result of a study carried out at the Lepetit plant of Anagni (FR) (chemical-pharmaceutical area) aiming at optimising the times of crossing and the cycle time of production through a reengineering of timing, of work organisation, of production management. The technique adopted were found on the principles of concurrent engineering through a techniques called PCAM (Plant Competitive Assistement Methodology).
Analysis and optimization of the cycle time of production in a processing firm
SILVESTRI, Alessandro;FALCONE, Domenico;DE FELICE, Fabio
2001-01-01
Abstract
The work proposed shows the result of a study carried out at the Lepetit plant of Anagni (FR) (chemical-pharmaceutical area) aiming at optimising the times of crossing and the cycle time of production through a reengineering of timing, of work organisation, of production management. The technique adopted were found on the principles of concurrent engineering through a techniques called PCAM (Plant Competitive Assistement Methodology).File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.