A methodology for cost-effective design of jet grouted water-sealing bottom plugs is presented in this paper. These massive barriers, made of partially overlapping jet grouted columns, are required to ensure temporary waterproofing to the excavation areas and adequate uplift resistance against water loads. Therefore, the proposed calculation procedure simultaneously focuses on the structural performance and continuity of the plug. Design may be optimised by considering the possibility of reducing column length, performing injections only in the lower part of the plug and leaving the upper part of the plug untreated. The reduction in column length may then result in a very slender slab and a structural check has to be performed to avoid tension fracturing or overall structural collapse. Additionally, in spite of strict controls, jet grouted columns are never perfectly cylindrical nor exactly aligned along their prescribed position, and thus the plug may present imperfections. Statistical evaluation of defects with experimental data from different field trials and their simulation with the Monte Carlo method shows that the imperfections are less relevant for the structural performance of the plug, but must be carefully taken into account in the analysis of seepage. Imperfections have been thus introduced in the structural analysis by means of partial factors evaluated from probabilistic analysis. The latter calculation provides a rule to control the effects of incomplete watertightness of the plug. The introduced relations are expressed with design charts.

Design of jet grouted excavation bottom plugs

MODONI, Giuseppe;CROCE, Paolo
2016-01-01

Abstract

A methodology for cost-effective design of jet grouted water-sealing bottom plugs is presented in this paper. These massive barriers, made of partially overlapping jet grouted columns, are required to ensure temporary waterproofing to the excavation areas and adequate uplift resistance against water loads. Therefore, the proposed calculation procedure simultaneously focuses on the structural performance and continuity of the plug. Design may be optimised by considering the possibility of reducing column length, performing injections only in the lower part of the plug and leaving the upper part of the plug untreated. The reduction in column length may then result in a very slender slab and a structural check has to be performed to avoid tension fracturing or overall structural collapse. Additionally, in spite of strict controls, jet grouted columns are never perfectly cylindrical nor exactly aligned along their prescribed position, and thus the plug may present imperfections. Statistical evaluation of defects with experimental data from different field trials and their simulation with the Monte Carlo method shows that the imperfections are less relevant for the structural performance of the plug, but must be carefully taken into account in the analysis of seepage. Imperfections have been thus introduced in the structural analysis by means of partial factors evaluated from probabilistic analysis. The latter calculation provides a rule to control the effects of incomplete watertightness of the plug. The introduced relations are expressed with design charts.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11580/52059
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 52
social impact