For Generation Companies (GENCOs) one of the most relevant issue is the commitment of the units, the scheduling of them over a daily (or longer) time frame, with the aim of obtaining the best profit. It strongly depends on the plant operational generation costs, which depend in turn on the choices taken at the design stage; it follows that design technical choices should also aim at determining the best generation cost structure of generating units with respect to the market opportunities. In the paper the unit commitment (UC) problem has been considered, with highlights on changes in the market scenario. The paper analyzes the relevance of some design choices (structure, size, regulation type) on the economics of the operation of gas–steam combined cycle generating units. To solve the UC problem, a recently proposed method for mixed integer nonlinear programming problems, with the use of a derivative free algorithm to solve the continuous subproblems, has been considered. The results for two GENCOs are reported: one managing a single unit and the other managing three units. Numerical examples show the sensitivity of the UC solutions to the market conditions and to the design choices on the regulation type in the evolving scenario of the Italian Electricity Market.

Combined Cycle Unit Commitment in a Changing Electricity Market Scenario

CASOLINO, Giovanni Mercurio
;
LIUZZI, Giampaolo;LOSI, Arturo
2015-01-01

Abstract

For Generation Companies (GENCOs) one of the most relevant issue is the commitment of the units, the scheduling of them over a daily (or longer) time frame, with the aim of obtaining the best profit. It strongly depends on the plant operational generation costs, which depend in turn on the choices taken at the design stage; it follows that design technical choices should also aim at determining the best generation cost structure of generating units with respect to the market opportunities. In the paper the unit commitment (UC) problem has been considered, with highlights on changes in the market scenario. The paper analyzes the relevance of some design choices (structure, size, regulation type) on the economics of the operation of gas–steam combined cycle generating units. To solve the UC problem, a recently proposed method for mixed integer nonlinear programming problems, with the use of a derivative free algorithm to solve the continuous subproblems, has been considered. The results for two GENCOs are reported: one managing a single unit and the other managing three units. Numerical examples show the sensitivity of the UC solutions to the market conditions and to the design choices on the regulation type in the evolving scenario of the Italian Electricity Market.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11580/44629
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 9
social impact