The present paper proposes the development of a virtual model simulating an assembly line. Starting from the analysis of the real line, through an incremental approach, a simulation model is created, verified and validated, in order to obtain useful information about: • productive capacity; • partial and total lead time; • Percentage of saturation, Value Added (VA) and Non-Value Added (NVA), for each worker and station. During the development phase, an important goal has been pursued: the possibility to use and change the model without knowing the creation logic. It is possible to change input parameters through simple tables, which contain times of man-machine operations. You can easily set times in order to move an operation from one station to another or to add/delete a job in a station, according to the technological and ergonomic constraints of the process. Moreover, the acquisition of scheduling data is extremely easy and starts from the generation of a list of production codes related to different work-cycles.

Study and modelling of very flexible lines through simulation

SILVESTRI, Alessandro;FALCONE, Domenico;DI BONA, Gianpaolo;
2010-01-01

Abstract

The present paper proposes the development of a virtual model simulating an assembly line. Starting from the analysis of the real line, through an incremental approach, a simulation model is created, verified and validated, in order to obtain useful information about: • productive capacity; • partial and total lead time; • Percentage of saturation, Value Added (VA) and Non-Value Added (NVA), for each worker and station. During the development phase, an important goal has been pursued: the possibility to use and change the model without knowing the creation logic. It is possible to change input parameters through simple tables, which contain times of man-machine operations. You can easily set times in order to move an operation from one station to another or to add/delete a job in a station, according to the technological and ergonomic constraints of the process. Moreover, the acquisition of scheduling data is extremely easy and starts from the generation of a list of production codes related to different work-cycles.
2010
978-145030069-8
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11580/4414
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 18
social impact