The paper reports on the construction of a large diameter railway tunnel located near the city of Florence. The tunnel was excavated in loose soils and at shallow depth under existing urban roads, pipelines and old residential buildings. The results of the experimental measurements performed during construction are presented. In particular, data sets obtained from high precision levelling are analysed in order to evaluate the settlements induced by construction procedure at ground level.

Monitoring results of a tunnel excavation in urban area

RUSSO, Giacomo;MODONI, Giuseppe
2006-01-01

Abstract

The paper reports on the construction of a large diameter railway tunnel located near the city of Florence. The tunnel was excavated in loose soils and at shallow depth under existing urban roads, pipelines and old residential buildings. The results of the experimental measurements performed during construction are presented. In particular, data sets obtained from high precision levelling are analysed in order to evaluate the settlements induced by construction procedure at ground level.
2006
9780415391245
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11580/13322
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 9
social impact